Skip to code content (skip section selection)
Compare to:
Creve Coeur Overview
Creve Coeur, IL Code of Ordinances
VILLAGE CODE of CREVE COEUR, ILLINOIS
ORDINANCES PENDING REVIEW FOR CODIFICATION
ADOPTING ORDINANCE
TITLE 1 ADMINISTRATIVE
TITLE 2 BOARDS AND COMMISSIONS
TITLE 3 BUSINESS REGULATIONS
TITLE 4 BUILDING REGULATIONS
TITLE 5 FIRE REGULATIONS
TITLE 6 POLICE REGULATIONS
TITLE 7 HEALTH AND SANITATION
TITLE 8 PUBLIC WAYS AND PROPERTY
TITLE 9 TRAFFIC
TITLE 10 ZONING
TITLE 11 SUBDIVISIONS
Loading...
8-11-19: CLEANUP AND RESTORATION:
Upon completion of all construction or maintenance of facilities, the utility shall remove all excess material and restore all turf and terrain in a timely manner and to the satisfaction of the Village. This includes restoration of entrances and side roads. Restoration of roadway surfaces shall be made using materials and methods approved by the Village. Such cleanup and repair may be required to consist of backfilling, regrading, reseeding, resodding, or any other requirement to restore the right-of-way to a condition substantially equivalent to that which existed prior to the commencement of the project. (Ord. 814, 4-11-2018)
8-11-20: MAINTENANCE AND EMERGENCY MAINTENANCE:
   (A)   General: Facilities on, over, above, along, upon, under, across, or within rights-of-way are to be maintained by or for the utility in a manner satisfactory to the Village and at the utility's expense.
   (B)   Emergency Maintenance Procedures: Emergencies may justify non-compliance with normal procedures for securing a permit:
      1.   If an emergency creates a hazard on the traveled portion of the right-of-way, the utility shall take immediate steps to provide all necessary protection for traffic on the highway or the public on the right-of-way including the use of signs, lights, barricades or flaggers. If a hazard does not exist on the traveled way, but the nature of the emergency is such as to require the parking on the shoulder of equipment required in repair operations, adequate signs and lights shall be provided. Parking on the shoulder in such an emergency will only be permitted when no other means of access to the facility is available.
      2.   In an emergency, the utility shall, as soon as possible, notify the Village of the emergency, detail what steps have been taken for protection of the traveling public and what will be required to make the necessary repairs. If the nature of the emergency is such as to interfere with the free movement of traffic, the Village police shall be notified immediately.
      3.   In an emergency, the utility shall use all means at hand to complete repairs as rapidly as practicable and with the least inconvenience to the traveling public.
   (C)   Emergency Repairs: The utility must file in writing with the Village a description of the repairs undertaken in the right-of- way within forty eight (48) hours after an emergency repair. (Ord. 814, 4-11-2018)
8-11-21: VARIANCES:
   (A)   Request For Variance: A utility requesting a variance from one or more of the provisions of this chapter must do so in writing to the Village Clerk as a part of the permit application. The request shall identify each provision of this chapter from which a variance is requested and the reasons why a variance should be granted.
   (B)   Authority To Grant Variances: The Village Clerk in consultation with the Mayor, the Board of Trustees, and, if necessary, an engineer employed by the Village, shall decide whether a variance is authorized for each provision of this chapter identified in the variance request on an individual basis.
   (C)   Conditions For Granting Of Variance: The Village may authorize a variance only if the utility requesting the variance has demonstrated that:
      1.   One or more conditions not under the control of the utility (such as terrain features or an irregular right-of-way line) create a special hardship that would make enforcement of the provision unreasonable, given the public purposes to be achieved by the provision; and
      2.   All other designs, methods, materials, locations or facilities that would conform with the provision from which a variance is requested are impracticable in relation to the requested approach.
   (D)   Additional Conditions For Granting Of A Variance: As a condition for authorizing a variance, the Village may require the utility requesting the variance to meet reasonable standards and conditions that may or may not be expressly contained within this chapter but which carry out the purposes of this chapter. (Ord. 814, 4-11-2018)
8-11-22: PENALTIES:
Any person who violates, disobeys, omits, neglects or refuses to comply with any of the provisions of this chapter shall be subject to fine in accordance with the penalty provisions of this Code. There may be times when the Village will incur delay or other costs, including third party claims, because the utility will not or cannot perform its duties under its permit and this chapter. Unless the utility shows that another allocation of the cost of undertaking the requested action is appropriate, the utility shall bear the Village's costs of damages and its costs of installing, maintaining, modifying, relocating, or removing the facility that is the subject of the permit. No other administrative agency or commission may review or overrule a permit related cost apportionment of the Village. Sanctions may be imposed upon a utility who does not pay the costs apportioned to it. (Ord. 814, 4-11-2018)
8-11-23: ENFORCEMENT:
Nothing in this chapter shall be construed as limiting any additional or further remedies that the Village may have for enforcement of this chapter. (Ord. 814, 4-11-2018)
8-11-24: SEVERABILITY:
If any section, subsection, sentence, clause, phrase or portion of this chapter is for any reason held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision and such holding shall not affect the validity of the remaining portions hereof. (Ord. 814, 4-11-2018)