§ 53.69 INSTALLATION OF EROSION CONTROL SYSTEMS.
   Runoff and erosion control systems shall be installed as soon as possible during the course of site development. Perimeter and entrance/exit erosion facilities are required prior to the start of any site work. Basins should be designed to collect sediment and debris in specific locations so that removal costs are kept to a minimum.
(Ord. 2-2010, passed 3-8-10)