Section
155.01 Street excavation permits
155.02 Zoning application
155.03 Zoning appeals
155.04 Building Code
155.05 Building Code appeals
155.06 Subdivision review
155.07 Stormwater management
155.08 Ordinance amendments
155.09 Sewage planning module review
155.10 Other fees
155.11 Tax collector
155.12 Residential rental registry
155.13 Water and sewer rate and regulation fees
155.14 Property Maintenance Code
(A) The PennDOT fee schedule will be assessed on highway occupancy permits issued for installations/construction within state routes that are also city street rights-of-ways. This fee schedule is available by contacting PennDOT.
(B) In addition to this schedule are permits necessary for installation of private driveway for egress to a city right-of-way and other excavations in city rows.
(1) A driveway residential permit application fee: $25.
(2) A driveway commercial and industrial permit application fee: $100.
(3) The city will provide installation of up to 40 feet of pre-purchased driveway pipe with aggregate overlay for a driveway entering a city roadway upon receipt of $400/driveway and signed waiver. Addition driveway widths will be installed upon receipt of an additional $10 per linear foot. The city will neither excavate nor install concrete or asphalt surfacing. Bonding security for open excavation is required in the following amounts:
(a) Other excavations in right-of-way: $25;
(b) Curb cutting: $50;
(c) Sidewalk construction: $25.