Section
General Provisions
56.01 Purpose
56.02 Authority
56.03 Applicability
56.04 Responsibility for administration
56.05 Ultimate responsibility
56.06 Definitions
56.07 Proper credentials or identification required
56.08 Prohibition of illicit connections
Stormwater Discharges
56.15 Discharge prohibitions
56.16 Suspension of MS4 access
56.17 Industrial or construction activity discharges
56.18 Monitoring of discharges; access to facilities
Stormwater Construction Permitting Fees
56.20 Stormwater construction permitting fees
Pollution Prevention
56.25 Requirement to prevent, control and reduce stormwater pollutants by the use of best management practices
56.26 Watercourse protection
56.27 Notification of spills
Administrative Enforcement Remedies
56.35 Enforcement
56.36 Notice of violation
56.37 Enforcement measures after appeal
56.38 Cost of abatement of the violation
56.39 Injunctive relief
56.40 Compensatory action
56.41 Violations deemed a public nuisance
Alternate Enforcement Remedies
56.55 Judicial enforcement remedies
56.56 Remedies not exclusive
Erosion Control
56.65 Compatibility with other permit and chapter requirements
56.66 Design criteria, standards, and specifications for erosion control measures
56.67 General requirements for all land- disturbing activities, with the exception of individual lots within a permitted project
56.68 General requirements for individual lots within a permitted project
56.69 Maintenance of erosion control measures
56.70 Permit application, erosion and sediment control plan, and permit issuance
56.71 Inspection
56.72 Enforcement
56.73 Project termination
Cross-reference:
Interim rate increase for management of stormwater, see § 51.38
Control of post construction stormwater runoff, see Ch. 156