CHAPTER 56: ILLICIT DISCHARGE AND CONNECTION TO THE MUNICIPAL STORMWATER SYSTEM
Section
General Provisions
   56.01   Purpose
   56.02   Authority
   56.03   Applicability
   56.04   Responsibility for administration
   56.05   Ultimate responsibility
   56.06   Definitions
   56.07   Proper credentials or identification required
   56.08   Prohibition of illicit connections
Stormwater Discharges
   56.15   Discharge prohibitions
   56.16   Suspension of MS4 access
   56.17   Industrial or construction activity discharges
   56.18   Monitoring of discharges; access to facilities
Stormwater Construction Permitting Fees
   56.20   Stormwater construction permitting fees
Pollution Prevention
   56.25   Requirement to prevent, control and reduce stormwater pollutants by the use of best management practices
   56.26   Watercourse protection
   56.27   Notification of spills
Administrative Enforcement Remedies
   56.35   Enforcement
   56.36   Notice of violation
   56.37   Enforcement measures after appeal
   56.38   Cost of abatement of the violation
   56.39   Injunctive relief
   56.40   Compensatory action
   56.41   Violations deemed a public nuisance
Alternate Enforcement Remedies
   56.55   Judicial enforcement remedies
   56.56   Remedies not exclusive
Erosion Control
   56.65   Compatibility with other permit and chapter requirements
   56.66   Design criteria, standards, and specifications for erosion control measures
   56.67   General requirements for all land- disturbing activities, with the exception of individual lots within a permitted project
   56.68   General requirements for individual lots within a permitted project
   56.69   Maintenance of erosion control measures
   56.70   Permit application, erosion and sediment control plan, and permit issuance
   56.71   Inspection
   56.72   Enforcement
   56.73   Project termination
Cross-reference:
   Interim rate increase for management of stormwater, see § 51.38
   Control of post construction stormwater runoff, see Ch. 156