§ 56.68 GENERAL REQUIREMENTS FOR INDIVIDUAL LOTS WITHIN A PERMITTED PROJECT.
   Provisions for erosion and sediment control on individual building lots regulated under the original permit of a project site owner must include the following requirements:
   (A)   The individual lot operator, whether owning the property or acting as the agent of the property owner, shall be responsible for erosion and sediment control requirements associated with activities on individual lots.
   (B)   Installation and maintenance of a stable construction site access road.
   (C)   Installation and maintenance of appropriate perimeter erosion and sediment control measures prior to land disturbance.
   (D)   Sediment discharge and tracking from each lot must be minimized throughout the land disturbing activities on the lot until permanent stabilization has been achieved.
   (E)   Clean-up of sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing the area with water. Cleared sediment must be redistributed or disposed of in a manner that is in compliance with all applicable statutes and rules.
   (F)   Adjacent lots disturbed by an individual lot operator must be repaired and stabilized with temporary or permanent surface stabilization.
   (G)   For individual residential lots, final stabilization will be achieved when the individual lot operator:
      (1)   Completes final stabilization; or
      (2)   Has installed appropriate erosion and sediment control measures for an individual lot prior to occupation of the home by the homeowner and has informed the homeowner of the requirement for, and benefits of, final stabilization.
(Ord. 2004-46, passed 1-11-2005)