A. After a permit is issued, the city engineer shall stake out, or have staked out, the established grade and line to which the sidewalk or curb and gutter must be built; and no additional charge shall be made therefor.
B. If the grade stakes are removed or lost before the proposed improvement is constructed or reconstructed, the city engineer shall cause the same to be reset, charging a fee, and issuing his official receipt therefor, in an amount equal to the fee for issuing such permit. (1960 Compilation § 14-105)