(a) Street Grading. No street grading shall be permitted until the final construction plans have been approved by the City Engineer and inspection fees have been paid. No street grading shall be commenced without a two (2) business day notice being given to the City Engineer.
(b) Street Subgrade. All streets shall be graded to their full width, including side slopes. No obstructions shall be placed or allowed to remain in the street right-of-way. The subgrade shall be free of sod and/or vegetative or organic matter. Soft clay and other unsuitable material shall be cleared to a depth as determined by the City Engineer. The subgrade shall be shaped and compacted subject to the requirements of the City Engineer, and no fill shall be placed until said subgrade has been inspected and approved.
(c) Pavement Application. No pavement shall be placed until the prepared subgrade has been inspected and approved by the City Engineer. The finish pavement course shall not be placed over the base course until a period of time as specified by the City Engineer has elapsed. All failures in the base course must be repaired prior to installation of the finish course.
(d) Street Signs. The Owner/Developer shall provide all traffic control, street name and parking signs at intersections and other locations as designated by the City. Such signs shall be purchased from the City. The City shall be responsible for the installation and maintenance of all such signs. (Ord. 27-11. Passed 3-14-11.)