1163.18 CONTENTS OF APPLICATION FOR APPROVAL OF FINAL DEVELOPMENT PLAN.
   An application for approval of the Final Development Plan shall be filed with the Zoning Inspector at least sixteen (16) working days prior to the Planning Commission's next scheduled meeting, by at least one (1) owner or lessee of property for which the planned unit development is proposed. Each application shall be signed by the owner attesting to the truth and exactness of all information supplied on the application for Final Development Plan. The Final Development Plan shall be prepared by a registered architect or engineer and, at a minimum, shall contain the following information and materials:
   (a)   A survey of the proposed development site, showing the dimensions and bearings of the property lines, areas in acres, topography, existing features of the development site, including major wooded areas, structures, streets, easements, utility lines, and land uses.
   (b)   All the information required in the Preliminary Development Plan, including the location and sizes of lots, location and proposed density of dwelling units, non-residential building intensity, and land use considered suitable for adjacent properties.
   (c)   A schedule for the development of units to be constructed in progression and a description of the design principles for buildings and streetscapes; tabulation of the number of acres on the proposed project for various uses, the number of housing units proposed by type; estimated residential population by type of housing; estimated nonresidential population, anticipated timing for each unit; and population density and public improvements proposed for each unit of the development whenever the applicant proposes an exception from standard zoning districts or other resolution governing development.
   (d)   Engineering feasibility studies and plans showing, as necessary, water, sewer, drainage, electricity, telephone, and natural gas installations; waste disposal facilities; street improvements, and, nature and extent of earth work required for traffic circulation and street improvements, and nature and extent of earth work required for site preparation and development.
   (e)   Site plan, showing building(s), various functional use areas, circulation and their relationship.
   (f)   Architectural renderings and accompanying narrative to discuss in detail the design treatment of all buildings and structures where applicable.
   (g)   Plans for landscaping and signage.
   (h)   Deed restrictions, protective covenants, and other legal statements or devices to be used to control the use, development and maintenance of land, and the improvements thereon, including those areas which are commonly owned and maintained. (Ord. 27-11. Passed 3-14-11.)