1113.02 CONDITIONS UNDER WHICH A ZONING CERTIFICATE IS REQUIRED.
   A zoning certificate is required for any of the following:
   (a)   Occupancy and/or use of vacant land.
   (b)   Construction or structural alteration of any building or structure, including accessory buildings.
   (c)   Change in use of an existing building or accessory building to a use not listed as a permitted use in the zoning district where the building is located.
   In no case shall a zoning certificate be required in the event of a change in ownership or tenancy only, without a change in use or proposed use, provided no repairs, alterations or additions are proposed for the building or structure.
(Ord. 27-11. Passed 3-14-11.)