1152.03 PROCEDURES.
      Upon the filing of a request for approval of a building permit, grade plan approval or subdivision, the Administrator shall use the following procedures to determine whether the proposed action is governed by provisions of this chapter and whether a hillside protection permit is required for a parcel or part of a parcel.
   (a)   The average percent slope shall be calculated, and this information shall be supplied by the applicant at the time of filing of the application with the Municipality.
   (b)   The application shall be reviewed by the Municipal Engineer who shall then notify the Administrator if a hillside protection permit is required.
   (c)   If a hillside protection permit is required, the owner/developer shall be required to include hillside control measures with grading, hydrological and landscaping plans as specified in Section 1152.04.These plans shall be submitted to the Municipal Engineer for approval.
   (d)   If it is determined by the Administrator that the action is governed by these provisions, then a hillside protection permit shall be required before a building permit or subdivision permit is issued to the owner or developer by the Municipality. A hillside protection permit shall be issued in phases as determined by the Administrator and the Municipal Engineer before the next phase permit will be issued.
      Refer to Section 1152.06 for additional information on administration and enforcement.
(Ord. 2019-39. Passed 8-13-19.)