Access requirements in the B-1 Zone shall be as follows:
B. Commercial development which may not be able to meet the requirements of Sections 17.56.080 — 17.56.100, and are requesting deviations from the noted standards, shall submit to the city engineer an engineer's report certified by a professional engineer addressing the following site conditions both present and future:
1. Traffic volumes;
2. Turning movements;
3. Traffic controls;
4. Site design;
5. Site distances;
6. Location and alignment of other access points.
C. Based upon the above data, the city engineer shall determine whether a deviation from the required standards is justified, and if so, what alternative requirements will be necessary.
(Ord. 1178 § 5.7.5, 1987)