§ 6-13-8 WATER AND SEWER FEES.
   Permit fees for connection to the water distribution system and sewer system of the village shall be as prescribed in §§ 6-13-3 and 6-13-4. Water and sewer fees shall be due and payable at the time of issuance of a permit.
   (A)   Water meter fee. Water meter fee shall be based on the current cost to the village of the water meter, as determined by the Director of Public Works and given on the current schedule of costs produced by the Public Works Department.
   (B)   Water connection tap-on fee, potable water. The potable water connection tap-on fee shall be based upon the size of each service connection tap made into the water system, as follows:
Size of Tap
Tap-On Fee*
Size of Tap
Tap-On Fee*
3/4-inch
$150
1-inch
$200
1-1/2-inch
$250
2-inch
$300
3-inch
$600
4-inch
$1,000
6-inch
$1,500
8-inch
$2,000
10-inch
$2,500
NOTES TO TABLE:
* In the event any building or premises contains more than one dwelling or commercial unit, an additional fee of $150 per each additional unit shall be required.
   (C)   Water connection tap-on fee, fire suppression. The fire suppression system water connection tap-on fee shall be based upon the size of each service connection tap made into the water system, as follows:
Size of Tap
Tap-On Fee
Size of Tap
Tap-On Fee
3/4-inch
$50
1-inch
$50
1-1/2-inch
$50
2-inch
$50
3-inch
$60
4-inch
$100
6-inch
$150
8-inch
$200
10-inch
$250
   (D)   Water connection tap-on fee, combined system. If a connection to the water system shall be of a size sufficient to provide potable water to the facility as well as water for a fire suppression system, the water connection tap-on fee shall be based upon the size of the water tap made into the water system, as prescribed in § 6-13-8(B).
   (E)   Sanitary sewer connection tap-on fee. The sanitary sewer connection tap-on fee shall be based upon the size of each separate service connection tap made into the sanitary sewer system, as follows:
 
Size of Tap
Tap-On Fee *
6-inch
$200
8-inch
$700
10-inch
$1,200
12-inch
$1,800
15-inch
$2,500
* In the event any building or premises contains more than one dwelling or commercial unit, an additional fee of $150 per each additional unit shall be required.
   (F)   Water and sewer expansion connection fee, residential. The water and sewer expansion connection fee for residential units shall be based upon the number and type of residential units, as follows:
 
Type of Property
Fee per Unit
Multiple-family residential building
   Efficiency or studio apartment
$865
   1-bedroom apartment
$1,297
   2-bedroom apartment
$1,730
   3-bedroom apartment
$2,162
Single-family residence, attached or detached
$2,595
   (G)   Water and sewer expansion connection fee, commercial/industrial/institutional. The water and sewer expansion connection fee for commercial, industrial and institutional users shall be $865 per 100 gallons of estimated average daily water consumption, with a minimum fee of $865. The estimate must be submitted by the party in responsible charge of the design and approved by the Building Official or his or her designee.
   (H)   Water and sewer expansion connection fee, water connection only. The water and sewer expansion connection fee for a user who seeks a connection only to the water system of the village shall be 28% of the water and sewer expansion connection fee otherwise applicable to the property. The water and sewer expansion connection fee for a user who seeks a connection only to the sanitary sewer system of the village shall be 72% of the water and sewer expansion connection fee otherwise applicable to the property.
   (I)   Water and sewer service connection repair permit fee. The permit fee for the repair of service connections to the village’s water and sewer systems shall be as prescribed in § 6-13-3(C) and § 6-13-4(B).
   (J)   Insurance and performance bond requirements. No permit for a water or sewer connection shall be issued unless the person applying therefor, or the contractor, shall have first procured public liability insurance meeting the requirements of § 13-2-7, and have filed with the village a performance bond meeting the requirements of § 13-2-8.
(Ord. 2010-04-23, passed 4-5-2010; Ord. 2013-04-11, passed 4-15-2013)