(A) Type D – new construction, additions, alterations and accessory structures. All plan review and clerical fees shall be due and payable at the time an application for permit is submitted. The development services fee and inspection fees shall be due and payable at the time of issuance of a permit. Fees as specified in this section shall pertain to the following types of building permits:
Accessory structure, miscellaneous 1
Building addition 1
Interior remodeling
New principal building 1
Restoration
Work not listed herein but similar to one of the above, as directed by the building official
(1) Clerical fee. $160.00.
(2) Plan review fees. Plan review fees for commercial, industrial, institutional and multiple-family residential new construction, additions, alterations and accessory structures shall be in accordance with Table 6-13-4(A)(1), based on the types of reviews required.
Volume of Building or Work Area (cubic ft.) | Commercial, Industrial, Institutional and Multiple-Family Residential Plan Review Fees Type D - New Construction, Additions, Alterations and Accessory Structures | |||||||
Building | Zoning | Plumbing | Mechanical | Electrical | Energy | Accessibility | Fire Code, High Hazard, NFPA Reviews |
Volume of Building or Work Area (cubic ft.) | Commercial, Industrial, Institutional and Multiple-Family Residential Plan Review Fees Type D - New Construction, Additions, Alterations and Accessory Structures | |||||||
Building | Zoning | Plumbing | Mechanical | Electrical | Energy | Accessibility | Fire Code, High Hazard, NFPA Reviews | |
Up to 60,000 | $380 | $80 | $115 | $115 | $190 | $220 | $115 | See § 6-13-7 |
60,001 to 80,000 | $470 | $80 | $118 | $118 | $235 | $235 | $118 | |
80,001 to 100,000 | $600 | $80 | $150 | $150 | $300 | $300 | $150 | |
100,001 to 150,000 | $690 | $80 | $173 | $173 | $345 | $345 | $173 | |
150,001 to 200,000 | $780 | $80 | $195 | $195 | $390 | $390 | $195 | |
Over 200,000 | $910 plus $10 per each additional 10,000 c.f. | $80 | 25% of Building Fee | 25% of Building Fee | 50% of Building Fee | 50% of Building Fee | 25% of Building Fee | |
(3) Fees for additional reviews. Review fees are based on up to two review cycles. If additional review is required, and if it is determined by the building official that the need for additional review is owing to non-responsiveness to review comments on the part of the permit applicant, then an additional plan review fee in the amount of 25% of the total initial plan review fees shall be charged for each additional review cycle, and payment shall be required at time of resubmittal for review.
(4) Development services fee. The development services fee for commercial, industrial, institutional and multiple-family residential construction shall be based on the estimated valuation of the cost of construction provided by the permit applicant. The fee shall be $6.70 per $1,000 of valuation, with a minimum fee of $50. See § 6-13-5.
(5) Inspection fees. Inspection fees for commercial, industrial, institutional and multiple-family residential construction shall be in accordance with Table 6-13-4(A)(2), based on the types of inspections required.
Volume of Building or Work Area (cubic ft.) | Commercial, Industrial, Institutional and Multiple-Family Residential Inspection Fees Type D – New Construction, Additions, Alterations and Accessory Structures | |||||||
Building | Zoning | Plumbing | Mechanical | Electrical | Energy | Fire Code | Occupancy |
Volume of Building or Work Area (cubic ft.) | Commercial, Industrial, Institutional and Multiple-Family Residential Inspection Fees Type D – New Construction, Additions, Alterations and Accessory Structures | |||||||
Building | Zoning | Plumbing | Mechanical | Electrical | Energy | Fire Code | Occupancy | |
Up to 60,000 | $420 | $80 | $240 | $100 | $180 | $100 | See § 6-13-7 | $80 |
60,001 to 80,000 | $525 | $100 | $300 | $125 | $225 | $125 | $100 | |
80,001 to 100,000 | $630 | $120 | $360 | $150 | $270 | $150 | $120 | |
100,001 to 150,000 | $735 | $140 | $420 | $175 | $315 | $175 | $140 | |
150,001 to 200,000 | $840 | $160 | $480 | $200 | $360 | $200 | $160 | |
Over 200,000 | $945 | $180 | $540 | $225 | $405 | $225 | $180 | |
(6) Fees for additional inspections. Inspection fees are based on up to two of each type of required inspection. The fees for additional inspections shall be $80 per each, and payment shall be required at time of scheduling the inspection.
(7) Supplemental fees. If the scope of work includes work of the types listed in § 6-13-4(B), and such work is not, in the judgment of the building official, a customary and ancillary part of the construction, then the fees for such work as listed in § 6-13-4(B) shall be required, as applicable, in addition to those listed in this section.
(8) Fire prevention fees. If the scope of work includes work regulated by the adopted Fire Code of the Village of Carol Stream, then the fees for plan review and inspection of such work as listed in § 6-13-7(A) shall be required, as applicable, in addition to the fees listed in this section.
(9) Water and sewer fees. If connection to the Carol Stream water distribution system and/or sanitary sewer system is required, fees shall be in accordance with § 6-13-8.
(11) Expedited review fee. Expedited review is offered for permits for which the plan review is conducted solely by the village’s building codes consultant. The fee for expedited review shall be in accordance with § 6-13-6(B).
(B) Type E – miscellaneous commercial industrial, institutional and multiple-family residential. All plan review, clerical and inspection fees are included in the fees as listed in this section, below. The development services fee shall be as prescribed in § 6-13-4(B)(2). All fees for miscellaneous commercial industrial, institutional and multiple-family residential construction shall be due and payable at the time an application for permit is submitted.
(1) Plan review, clerical and inspection fees.
Accessory structure, minor2 | $200 |
Construction and sales trailers, temporary | $200 |
Conveyor system1 | $240 per level |
Demolition, major2 | $540 |
Demolition, minor, nonstructural or emergency | $80 |
Driveway (per each)2 | $120 |
Electrical, major (includes service upgrade) | $240 |
Electrical, minor (includes fixture replacement) | $160 |
Elevator1 | $600 per elevator bank |
Equipment (includes removal, installation, relocation)1 | $140 plus $20 per additional piece plus $80 for special permit process |
Fence, exterior (includes trash enclosure) | $200 |
Fence, interior | $120 |
Fire alarm system1 | $80 |
Fire pump test1 | $40 |
Fire suppression system1 | $80 |
Flagpole | $120 |
Foundation (preliminary work for a principal project) | $480 |
Furniture panels, with electrical work | $120 |
Hood and duct (type 1 w/o suppression)1 | $80 |
Hood suppression only, 15 flow points or less1 | $80 |
Hood suppression only, 16-29 flow points1 | $80 |
Hood suppression only, 30 or more flow points1 | $80 |
Hood and duct (type 2)1 | $80 |
HVAC equipment, new or replacement (boiler, furnace, heat pump, a/c, etc.)1 | $140 plus $20 per additional unit |
HVAC system, new1 | $240 |
Lawn irrigation system | $160 |
Low voltage wiring | $120 |
Mechanical | $120 |
Parking lot maintenance (sealcoating and striping) | $120 |
Parking lot patching, overlay, expansion or reconstruction2 | $120 |
Parking lot, temporary2 | $120 |
Patio, floor, slab, or stoop (per each)2 | $120 |
Plumbing | $300 |
Racking system (does not include sprinkler system)1 Less than 5.75 feet in height 5.75 feet or greater | No permit required $320 |
Roofing and siding | $160 |
Security alarm system | No permit required |
Sidewalk2 | $120 |
Sign, face change | $40 plus $10 per additional sign of the same type |
Sign, permanent, no electrical Ground Wall | $120 plus $20 per additional sign of the same type $80 plus $20 per additional sign of the same type |
Sign, permanent with electrical Ground Wall | $160 plus $20 per additional sign of the same type $120 plus $20 per additional sign of the same type |
Sign, temporary Sign, temporary, special event | $40 plus $10 per additional sign of the same type $40 plus $10 per additional sign of the same type |
Solar panels, commercial1 | $320 |
Spray booth1 | $480 per booth |
Storage tank, fuel tank, propane tank1 | $140 plus $20 per additional piece |
Structural modification, minor2 | $200 |
Swimming pool, commercial or public1, 2 | $700 |
Tent, temporary | $160 |
Utility service connection or repair2, 3 | $200 |
Window and doors | $160 |
Wireless communications dish/antenna/tower4 | $300 plus $100 per each additional review |
Work not listed herein, but similar to one of the above, as directed by the building official | As determined by the building official |
1 Fire Prevention Plan Review and Inspection fees required. See § 6-13-7(B). 2 Engineering fees and/or securities required unless waived by the building official. See § 6-13-9 and § 12-3-17. 3 Water and sewer fees required. See § 6-13-8. 4 Water Tower Plan Review and Inspection fees required. See § 6-13-6(A). | |
(2) Fees for additional reviews. Review fees are based on up to two review cycles. If additional review is required, and if it is determined by the building official that the need for additional review is owing to non-responsiveness to review comments on the part of the permit applicant, then an additional plan review fee in the amount of 25% of the total initial plan review fees shall be charged for each additional review cycle, and payment shall be required at time of resubmittal for review.
(3) Development services fee. The development services fee for miscellaneous commercial, industrial, institutional and multiple-family residential construction shall be based on the estimated valuation of the cost of construction provided by the permit applicant. The fee shall be $6.70 per $1,000 of valuation, with a minimum fee of $50. See § 6-13-5.
(4) Fees for additional inspections. Inspection fees for miscellaneous commercial industrial, institutional and multiple-family residential permits are based on up to two of each type of required inspection. Additional inspections shall be compensated at $80 per each, and such payment shall be required at time of scheduling the inspection.
(5) Expedited review fee. Expedited review is offered for permits for which the plan review is conducted solely by the village's building codes consultant. The fee for expedited review shall be in accordance with § 6-13-6(B).
(Ord. 2010-04-23, passed 4-5-2010; Ord. 2011-04-11, passed 4-18-2011; Ord. 2013-04-11, passed 4-15-2013; Ord. 2017-02-06, passed 2- 21-2017; Ord. 2019-02-05, passed 2-19-2019; Ord. 2020-04-11, passed 4-6-2020; Ord. 2023-04-17, passed 4-17-2023; Ord. 2024-04-15, passed 4-1-2024)
Notes
1 | Public Improvement Preservation Bond required unless waived by the building official. See § 12-3-17. |
1 | Public Improvement Preservation Bond required unless waived by the building official. See § 12-3-17. |
1 | Public Improvement Preservation Bond required unless waived by the building official. See § 12-3-17. |