The plumber laying the lateral shall be responsible for traffic control and public safety of the operation of installing the wye connection, and shall be responsible for complete excavating; shoring, if required; backfilling; and repaving, as required by the public agency at the location of the proposed wye connection.
(Ord. 1965-37, passed 12-7-1965) Penalty, see § 32.999