§ 33.372 CONNECTION TO BUILDING DRAIN (PLUMBING KICK OUT).
   (A)   After a permit authorizing said construction has been issued, private sewers may be constructed up to a point two feet from the building wall. Actual connection of the private sewer to the building drain (building plumbing) will not be permitted until the main sewer or private sewer to which it connects has been accepted by the District and the subject private sewer has been satisfactorily tested in accordance with §§ 33.220 through 33.224.
   (B)   Actual connection must be done by a sewer contractor with a valid sewer construction permit issued by the District. Work must be done in the presence of, and to the satisfaction of, the Engineer.
(Ord. 2019-02, passed 4-25-2019)