Acreage used for determination of “availability contributions or costs” for off-site transmission line, on-site distribution system oversizing, and/or existing system reinforcing construction shall include total property area except areas designated in and on approved plans such as cemeteries, golf courses and flood prone areas which may, at the discretion of the Board of Public Works and Safety be excluded. Any real estate owner of the above designated areas may file with the Board of Public Works and Safety a request to exclude acreage as set forth above, in the determination of the “availability contributions or costs” for the affected property.
(`91 Code, § 9-32) (Ord. A-54, § 4.03 (c), 1-4-82)