Prior to the issuing of a final well permit and upon completion of drilling the well, the following information shall be provided to Carmel Utilities:
(a) Piping Schematic Diagram. This shall show all piping starting at the well and all places to which the pipe goes from the well. If the well is geothermal, the schematics shall show all parts of the geothermal system and its related piping.
(b) A copy of the well permit application.
(c) A copy of the well site approval.
(d) Copies of all construction and drilling inspection reports.
(e) A well log which shall include the following information:
(1) Purpose of the well.
(2) If geothermal, the type.
(3) A drawing showing the side view of the well indicating depth, thickness, and type of each material drilled through.
(4) Depth of the screen placed.
(5) Length of screen.
(6) Screen slot size.
(7) Bowl setting.
(8) Motor horsepower.
(9) Measured GPM output of the well after completion.
(10) Pump depth setting, if submergible.
(11) Static level.
(12) Well pumping level.
(13) Well diameter.
(14) Total well depth.
(`91 Code, § 7-76) (Ord. A-62, § V(D), 6-4-90; Ord. D-1663-04, 3-15-04)