921.07 COMPREHENSIVE STORM WATER MANAGEMENT PLAN.
   (a)   The Post-Construction Water Quality Control Plan developed to meet this regulation will be coordinated and combined with the Riparian and Wetland Setback Plan and the Storm Water Pollution Prevention Plan (SWP3) that are developed for the same site. These plans will be titled and numbered in one consecutive sequence to make a Comprehensive Storm Water Management Plan for the site. The Comprehensive Storm Water Management Plan so developed will serve as the Storm Water Pollution Prevention Plan (SWP3) required by Ohio EPA as part of the NPDES Storm Water Permit for General Construction.
   (b)   This regulation requires that a Comprehensive Storm Water Management Plan be developed and implemented for all soil disturbing activities disturbing one or more acres of total land, or less than one acre if part of a larger common plan of development or sale disturbing one or more acres of total land, and on which any regulated activity is proposed. A Comprehensive Storm Water Management Plan must be developed and implemented for all commercial and industrial site development on sites disturbing more than 0.5 acres. The City Engineer may require a comprehensive storm water management plan on sites disturbing less than one acre.
   (c)   The Comprehensive Storm Water Management Plan shall contain an application, narrative report, construction site plan sheets, a long-term Inspection and Maintenance Plan and Inspection and Maintenance Agreement and Inspection and Maintenance Plan, and a site description.
(Ord. 10088-2017. Passed 6-20-17.)