Section
Street Excavations
151.01 Excavations restricted
151.02 Permit application
151.03 Permit fee
151.04 Performance and damage bond required
151.05 Insurance required
151.06 Permit approval and issuance
151.07 Separate permits required
151.08 Excavation time limit
151.09 Obstructions prohibited
151.10 Each day a separate offense
Street Improvements
151.25 Participation by the town
151.26 Limitations
151.27 Scope of participation
151.28 Methods of participation
Sidewalks
151.40 Construction material
151.41 Minimum width
151.42 Sidewalks required
151.43 Sidewalk openings
151.44 Ice and snow removal
151.45 Failure to remove ice and snow
Appendix A: Permit Application to Excavate in a Right-of-Way
Appendix B: Guarantee for Sidewalk Installation Form