CHAPTER 55: STORMWATER CONTROL AND MANAGEMENT
Section
General Provisions
   55.01   Intent and purpose
   55.02   Definitions
   55.03   Applicability and scope; exemptions
   55.04   Review and determination by Director of Public Services
   55.05   Detailed site plan
   55.06   Inspection by city to assure conformance to approved plans and permits
   55.07   Fees
   55.08   Enforcement and penalties
   55.09   Construction of chapter; other applicable law
Storm Water and Detention
Technical Guidelines
   55.30   Intent and purpose
   55.31   Definitions
   55.32   Storm water design
   55.33   Direction of flow
   55.34   Connections and associated water quality
   55.35   Quantity of flow calculations
Storm Drain Design Facilities
   55.40   Inlet capacities for storm catchments
   55.41   Storm sewer networks and appurtenances
   55.42   Additional design constraints
Peak Flow Reduction
   55.50   Stormwater detention
   55.51   Projects subject to detention requirements
   55.52   Sequencing of ponds
   55.53   Maintenance of storage areas
   55.54   Design considerations
   55.55   Design requirements for detention ponds
   55.56   Required release rate
   55.57   Required storage volume
   55.58   Controlled outlet
   55.59   Emergency outlet
   55.60   Berm elevation (freeboard)
   55.61   Failed storm water facility
Forms; Schedules
   55.70   Detention calculation sheet
   55.71   Schedule of fees
   Appendix A: Rainfall Curves for Three-Year, Ten-Year and 25-Year Storms