(A) In the event it is determined by the planning commission that compliance with these design guidelines would result in extraordinary hardship to a developer proposing a large retail development due to the unusual topography or conditions beyond the control of the developer, then the planning commission may modify, vary, or waive the design guidelines, provided that the modification, variance, or waiver will not nullify the intent of these design guidelines, and provided further that the modification, variance, or waiver, and the reason therefor, shall be entered upon the minutes of the planning commission.
(B) Each modification, variance, or waiver of these design standards sought by a developer shall be specifically applied for in writing.
(Ord. No. 13-02, § 1, 6-3-03)