(A) All subdivision proposals shall be consistent with the need to minimize flood damage and are subject to all applicable standards in these regulations;
(B) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
(C) All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage;
(D) In all areas of special flood hazard where base flood elevation data are not available, the applicant shall provide a hydrologic and hydraulic engineering analysis that generates base flood elevations for all subdivision proposals and other proposed developments containing at least 50 lots or five acres, whichever is less; and
(E) The applicant shall meet the requirement to submit technical data to FEMA in § 152.029(A)(1)(d) when a hydrologic and hydraulic analysis is completed that generates base flood elevations as required by division (D) of this section.
(Ord. 2011-114, passed 2-15-2011)