(A) Lot alteration (grading, filling, or excavating) necessary for the construction of structures, sewage treatment systems, and driveways for movement of more than 50 cubic yards require a lot alteration permit, but this permit can be combined with construction permit for these facilities.
(B) Property owner must apply and receive a conditional use permit prior to receiving a permit for the movement of more than 600 cubic yards of material.
(Ord. passed 5-9-2017; Ord. passed 4-13-2021; Ord. passed 8-16-2022) Penalty, see § 10.99