(a) The Director may require the user to construct, at his or her own expense, monitoring facilities, including a control manhole, if necessary, to allow observation, inspection, sampling and measurement of the quantity, composition and concentration of waste to the building sewer or internal drainage systems and may also require sampling or metering equipment to be provided, installed and operated at the user's expense. The monitoring facility shall be situated on the user's premises, with accommodations to allow access by City representatives. There shall be ample room in or near the sampling point to allow accurate sampling and composting for analysis. All equipment and appurtenances thereto shall be maintained at all times in a safe and proper operating condition at the expense of the user. If self-monitoring reveals violation of any discharge limitations specified herein, the industrial user shall notify the City within twenty-four hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the City within thirty days after becoming aware of the violation.
(b) A person who violates any of the provisions of this section shall be subject to the penalty provided in Section 1040.99(a).
(Ord. 14-01. Passed 10-16-01.)