§ 152.127  UTILITIES.
   (A)   Water and sewer line construction is the responsibility of the Village Administrator. All such construction, whether it be a part of a subdivision development, an improvement or an extension shall meet the requirements of the latest approved and adopted regulations of the Village Administrator pertaining thereto and the Standard Details referenced in § 152.125.
   (B)   The regulation and Standard Details adopted by the Village Administrator shall include:
      (1)   Review process;
      (2)   Board authority;
      (3)   Village Engineer’s authority;
      (4)   Condition of approval;
      (5)   Construction materials and methods;
      (6)   Inspection; and
      (7)   Fees.
(1997 Code, § 152.122)  Penalty, see § 152.999