All fees shall be paid prior to the issuance of a permit or the commencement of an inspection or the issuance of a certificate in accordance with the following schedule:
(A) Plan Review And Inspection:
1. Single family residence, excluding plumbing:
2,499 sq. ft. or less | $1,400.00 |
2,500 to 4,999 sq. ft. | 0.60 per sq. ft. |
5,000 to 7,499 sq. ft. | 0.75 per sq. ft. |
7,500 sq. ft. or more | 0.90 per sq. ft. |
2. Single family residence, additions, enlargements and remodeling, excluding plumbing:
499 sq. ft. or less | $200.00 |
450 to 1,499 sq. ft. | 0.45 per sq. ft. |
1,500 sq. ft. or more | 0.55 per sq. ft. |
(Ord. 18-09, 8-27-2018, eff. 1-1-2019)
3. Accessory building, including nonresidential buildings and their additions, enlargements and remodeling:
249 sq. ft. or less | $200.00 |
250 to 749 sq. ft. | 300.00 |
750 sq. ft. or more | 0.40 per sq. ft. |
(Ord. 19-14, 7-22-2019)
4. Commercial buildings excluding plumbing:
2,499 sq. ft. or less | $2,100.00 |
2,500 to 4,999 sq. ft. | 0.90 per sq. ft. |
5,000 to 7,499 sq. ft. | 1.125 per sq. ft. |
7,500 sq. ft. or more | 1.35 per sq. ft. |
5. Accessory uses such as, but not limited to tennis courts, sport court, generators, and/or similar uses: Two hundred dollars ($200.00).
6. Swimming pools and/or spas: Five hundred fifty dollars ($550.00).
7. Plumbing, including septic system installation or repair: Two hundred fifty dollars ($250.00).
8. Each additional inspection or plan revision which is required to be undertaken by the Village either by reason of inaccuracies or incompleteness in the application or, in the sole discretion of the Building Officer, by reason of the unusual or extraordinary character of the construction or alteration including, without limitation, the inspection of any covered portions of the work, shall require a charge equal to the greater of: a) one hundred dollars ($100.00), or b) the actual cost to the Village for such additional inspection or plan revision. This fee shall be in addition to any other fee required under this chapter.
9. Each submittal of architectural, engineering or other required drawings shall be accompanied with a digitized copy (electronic format acceptable to the Village). In the event, a digitized copy is not received with each submittal, a digitization fee of fifty dollars ($50.00) may be applied for each submittal. A fee is applied to each architectural set of drawings and engineering set of drawings.
10. TREE PRESERVATION FEE TABLE
Item | Fixed Fee Amount1 |
Item | Fixed Fee Amount1 | |
New home construction | $590.00 | |
(With demolition as part of engineering package +$75.00) | ||
(With escrow calculation +$145.00) | ||
Demolition plan (stand alone/not part of engineering package) | 290.00 | |
Room addition | 340.00 | |
Accessory buildings and/or uses | 290.00 | |
Other required tree replacement inspections | 145.00 | |
Note:
1. Fixed fee amount includes review of initial plan submittal, 1 site visit, and 1 revision to the plan. Any revisions or changes beyond the first revision will be billed at T+M rates.
(B) Zoning Certificates: Zoning certificates, as required by section 5-10-2 of this Code shall require a charge of one hundred dollars ($100.00) plus the entire review expense of the Village Engineer as incurred to fulfill the duties required of the Zoning Enforcement Officer to issue said certificate.
(C) Certificate Of Compliance: A certificate of compliance, as required by section 5-10-3 of this Code shall require a charge of one hundred dollars ($100.00) plus the resolution of all violations of this Code and the payment of all fines and penalties assessed against the owner or the property under any of the provisions of this Code as provided in section 5-10-3 of this Code.
A Temporary Certificate of Occupancy may be issued at the discretion of the building official when a premises is substantially completed, all life safety and sanitary requirements are complete, and the premises are fit for the purpose constructed. The maximum time frame for a Temporary Certificate of Occupancy is at the discretion of the building official but not to exceed one hundred eighty (180) days. The fee for a Temporary Certificate of Occupancy is two hundred dollars ($200.00). (Ord. 18-09, 8-27-2018, eff. 1-1-2019)
(D) Refund: (Rep. by Ord. 19-14, 7-22-2019)
(E) Penalty: In the event construction work is started where a building permit is required to be issued a penalty may be assessed at the discretion of the building official. A fee surcharge of fifty percent (50%) of the total building permit fees, but not less than two hundred dollars ($200.00) and which shall include the cost of enforcement, including attorneys fees, shall be collected if construction or alterations are started before a required permit is issued.
(F) Stop Work Order Penalty: In the event construction activity has taken place when a building permit is required by this chapter a fee of two hundred dollars ($200.00) is required to be paid to the Village prior to removing the stop work order. (Ord. 18-09, 8-27-2018, eff. 1-1-2019)