§ 50.03 CONNECTION WITH WATER MAIN; PERMIT.
   (A)   When any person desires to connect with any water main in the town, he or she shall first obtain a written permit from the Utility Superintendent to do so. The permit will state the number of the lot, block and street number where the connection is to be made, the size of the connection and the proposed plumber who will complete the installation.
   (B)   The permit shall be filed with the Superintendent of the water works of the town at least seven days prior to the time of such connection. The Superintendent shall keep a record of all such permits and connections in a book to be kept for that purpose.
(Ord. 2021-10-02, passed 11-22-2021)