§ 9-5.2306 SUBMITTAL REQUIREMENTS.
   In addition to the required application submittal forms available from the Community Development Department and specified supporting materials, the following shall also be required for all P-D District establishment requests and shall be approved by the Planning Commission as a part of the final develop-ment plan:
   (A)   A listing of the development standards proposed for the P-D District (e.g., setbacks, lot sizes, building heights);
   (B)   A phasing plan indicating the approximate date when construction of the first development phase of the P-D District is scheduled to begin and tentative completion dates for the remaining phases.
   (C)   A Stormwater Control Plan prepared by an engineer or equally qualified professional as determined by the City Engineer. The City Engineer may require that the storm water control plan be prepared by a licensed civil engineer. All architectural, civil engineering, and landscape site plans shall be consistent with the storm water control plan.
(Ord. 897-C-S, passed 10-25-94; Am. Ord. 1064-C-S, passed 12-13-05)