(A) Any request to modify the design and/or product size of previously approved projects will be reviewed by staff to determine whether the change is major or minor. Generally speaking, a change will be considered to be major if it requires the development of a new model complex. Other criteria that would constitute a major change include:
(1) A modification in architecture and/or building materials that change the architectural style and/or character of the project.
(2) A significant change in unit size and/or floor plan.
(3) A change in unit mix that substantially changes the average unit size and/or character of the project.
(B) Minor changes would typically include such items as changes to architectural detailing, minor floor plan alterations, redistributions of product types without significant changes to the overall product mix, and the like.
(Ord. 897-C-S, passed 10-25-94)