§ 9-4.2010 STANDARDS FOR SUBDIVISIONS.
   (A)   All preliminary subdivision proposals shall identify the flood hazard area and the elevation of the base flood.
   (B)   All final subdivision plans shall provide the elevations of proposed structures and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided to the Floodplain Administrator.
   (C)   All subdivision proposals shall be consistent with the need to minimize flood damages.
   (D)   All subdivision proposals shall have public utilities and facilities, such as sewer, gas, electrical, and water systems, located and constructed to minimize flood damages.
   (E)   All subdivisions shall provide adequate drainage to reduce exposure to flood hazards.
('66 Code, § 9-4.2010) (Ord. 708-C-S, passed 5-12-88) Penalty, see §§ 1-2.01 et seq.