§ 9-4.1209 PARCEL MAP CHECKING; APPROVAL.
   (A)   Map checking.
      (1)   The subdivider shall submit three sets of prints of the map and certificate sheets to the Engineering Division for checking purposes before filing the map. The preliminary checking prints shall be accompanied by a preliminary title report.
      (2)   The error of closure in traverse in the subdivision and around the interior lots or blocks shall not exceed one part in 20,000.
      (3)   The Engineering Division, within 20 days, shall note any errors or omissions, if any, on one set of the preliminary prints and return them to the engineer or surveyor for the final revision of the maps.
   (B)   Map approval.
      (1)   The original tracing of the parcel map of the subdivision, prepared in accordance with the provisions of § 9-4.1206 of this article, shall be submitted to the Engineering Division for approval and transmitted to the County Recorder for filing.
      (2)   The parcel map shall be accepted for filing by the Engineering Division when the map and all of the required supplementary documents and fees have been presented and approved. The Engineering Division, within 60 days following receipt, shall present the parcel map to the County Recorder for filing.
   (C)   Time limits for filing. The time limit for filing the parcel map shall be one year from the date of the approval of the minor subdivision map by the Commission, unless an extension of time is granted as provided in § 9-4.1203 of this article.
   (D)   Evidence of title. The subdivider shall present to the County Recorder evidence of title as required by the Subdivision Map Act.
('66 Code, § 9-4.1209) (Ord. 275-C-S, passed 3-11-75)