§ 9-4.513 PRELIMINARY SOIL REPORTS; REQUIRED.
   Prior to the submission of the final subdivision map, the subdivider shall file with the City Engineer a preliminary soil report, prepared by a civil engineer who is registered by the state, based upon adequate test borings or excavations of every subdivision, as defined in Cal. Gov't Code §§ 66490 and 66491. The preliminary soil report may be waived if the City Engineer shall determine that, due to the knowledge of such department as to the soil qualities of the subdivision, no preliminary analysis is necessary.
('66 Code, § 9-4.513) (Ord. 275-C-S, passed 3-11-75)