Backfilling of an excavation shall be in accordance with specifications established by the City Engineer or as otherwise required by him, both as to material and method, and backfill shall not be placed in any excavation without compaction of the material used therein, the degree and method thereof to be to the satisfaction of the City Engineer.
('66 Code, § 7-2.616) (Ord. 41-C-S, passed 2-7-68) Penalty, see §§ 1-2.01 et seq.