Accessory construction facilities, including temporary batching plant for asphaltic or Portland cement concrete, or temporary building or yard for construction materials and equipment shall be permitted in any zoning district upon obtaining a conditional use permit from the Board of Adjustment, after it is ascertained that such batching plant, yard, or building is both incidental to and necessary for construction operations within two miles of the plant yard or building. Each conditional use permit for such plant, yard, or building shall specify the location of the proposed facility and the area to be served thereby. Each such permit shall be granted for the period of not more than 180 days, and such permits shall not be granted for the same location for more than four such periods during any 30-month period. Ingress to and egress from such facilities shall be only from major thoroughfares or collector streets, provided however, that the Board of Adjustment may approve a location on another thoroughfare if the Board finds that such location would give rise to less traffic on residential thoroughfares than would an otherwise feasible location on a major thoroughfare or collector street.
(Prior Code, Appendix B, § 50.6600) (Ord. 702, passed 3-15-1971)