Loading...
§ 90.34 ISSUANCE OF PERMIT.
   When proper application for a permit has been made, and the appropriate inspector is satisfied that the application and the proposed work comply with the provisions of this chapter and the appropriate regulatory codes, he shall issue the permit, upon payment of the proper fee or fees as hereafter provided.
(Am. Ord. 21-26, passed 7-12-21; Am. Ord. 21-40, passed 9-7-21)
§ 90.35 REVOCATION OF PERMITS.
   The appropriate inspector may revoke and require the return of any permit by notifying the permit holder in writing, stating the reason for the revocation. Permits shall be revoked for any material departure from the approved application, plans, or specifications; for refusal or failure to comply with proper orders of the inspector; for refusal or failure to comply with requirements of this chapter and the appropriate regulatory codes; or for false statements or misrepresentations made in securing the permit.
(Am. Ord. 21-26, passed 7-12-21; Am. Ord. 21-40, passed 9-7-21)
§ 90.36 TIME LIMITATIONS ON VALIDITY OF PERMITS.
   All permits issued under this chapter shall expire by limitation three months after the date of issuance if the work authorized by the permit has not been commenced. If after commencement, the work is discontinued for a period of 12 months, the permit therefor shall immediately expire. No work authorized by any permit which has expired shall thereafter be performed until a new permit has been secured.
(Am. Ord. 21-26, passed 7-12-21; Am. Ord. 21-40, passed 9-7-21)
§ 90.37 CHANGES IN WORK.
   After a permit has been issued, changes or deviations from the terms of the application and permit, or changes or deviations from the plans or specifications involving any work under the jurisdiction of this chapter or of any regulatory code adopted herein, shall not be made until specific written approval of the changes or deviations has been obtained from the appropriate inspector.
(Am. Ord. 21-26, passed 7-12-21; Am. Ord. 21-40, passed 9-7-21; Am. Ord. 22-01, passed 1- 3-22) Penalty, see § 10.80
§ 90.38 PERMIT FEES; INSPECTION FEES.
   (A)   Permit fees. Fees for permits shall be based on the total estimated cost of the proposed work, including all subcontracts if any, but in no case shall the total estimated cost be less than the market value of similar completed work in the city as determined by the appropriate inspector or inspectors. Permit fees shall be as established by the Council and filed in the office of the Building Inspector.
   (B)   Inspection fees. Building permit fees for the construction, alteration, or addition of buildings shall be based upon the total cost of the general construction, alteration, or addition. The term "total cost of construction" shall mean the greater amount of a bona fide bid price, duly authenticated, of the general construction, alteration, or addition or a sum equal to the product of the number of square feet of the general construction, alteration, or addition multiplied by $25. Building permit fees shall be as stated below.
      (1)   All construction except as referred to in divisions (2), (3), and (4) below.
 
Total Construction Cost 
Fees
First $10,000.00
Minimum $10.00
$10,001.00 - 200,000.00
$1.00 per thousand
$200,001.00 and above
$.50 per thousand
Maximum permit
$10,000.00
   
      (2)   Piers, bulkhead and waterway structures.
         (a)   Permit fees shall be $1.00 per $1,000.00 of construc-tion, alteration, or additional cost or fraction thereof over $1,000.00 with a minimum fee of $10.00.
         (b)   No permit fee shall be charged for any construc- tion, alteration, or addition the cost of which is $50.00 or less.
      (3)   Mechanical permit. In addition to the fees charged above, a fee for heating installation and for air condition installation shall be charged as follows:
Heating            $ .80 per square feet of area to be heated
Air Conditioning    .50 per square feet of area to be air conditioned (it is estimated the fees will be approximately $2.50 for each $500.00 of installation cost)
Minimum fee          10.00
      (4)   Mobile homes. A permit fee of $15.00 shall be charged for mobile homes.
(Ord. 83-17, passed 6-20-83; Am. Ord. 21-26, passed 7-12-21; Am. Ord. 21-40, passed 9-7-21)
§ 90.39 CITY HELD HARMLESS.
   The applicant seeking a permit required by this and other chapters under the jurisdiction of the Inspections Section shall hold the city harmless from claims of bodily injury and/or property damage of all persons arising out of the use or occupancy of the premises as specified on the permit by the applicant, his agents, employees, or invitees.
(Am. Ord. 21-26, passed 7-12-21; Am. Ord. 21-40, passed 9-7-21)
MINIMUM HOUSING STANDARDS
Loading...