6.6.11.   As-Built Plans Required
   A.   Public Improvements. Upon completion of a public infrastructure project, the developer shall certify to the Town Engineer that the completed project has been constructed in accordance with the approved plans and shall submit actual "as built" plans for all public improvements after final construction is completed.
   B.   Stormwater Management Facilities. Upon completion of a private stormwater management facility, the developer shall certify to the Stormwater Administrator that the completed project is in accordance with the approved plans and shall submit actual "as built" plans after final construction is completed. The plans shall show the final design specifications for all improvements and the field location, size, depth, and related measures, controls and devices, as installed. The designer shall certify, under seal, that the as-built design, measures, controls, and devices are in compliance with the approved plans and with the requirements of this Ordinance.
   C.   Inspection Required. A final inspection and approval by the appropriate Town official (see Section 6.6.6, Administration of Guarantees) shall occur before the release of the performance guarantee.
(Ord. 2020-36, passed 12-2-2019)