905.13 TEST HOLES.
   A street opening permit shall be obtained for any test hole work. No test holes shall be made in or upon a greater surface of the highway than as specified in such permit, and no excavation or test holes shall interfere with any of the water pipes, sewers or drains of the City, or any other underground utility service. Test holes shall be backfilled in accordance with the provisions set by the City Engineer.
(Ord. 37-2005. Passed 9-20-05.)