§ 52.54 MEASUREMENT OF FLOW/MONITORING FACILITIES.
   (A)   The volume of flow used in computing industrial waste surcharge shall be based upon metered water consumption maintained by YCWSD. In the event that a user discharging wastes into the YCWSD system provides YCWSD with evidence that more than 10% of the total annual volume of water used does not reach the POTW, an estimated percentage of total water consumption to be used in computing industrial waste flows and surcharges may be agreed upon between YCWSD and the user discharging industrial wastes into the POTW.
   (B)   YCWSD shall require to be provided and operated at the user's own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building, sewer and/or internal drainage systems. The monitoring facility should normally be situated on the user's premises, but YCWSD or POTW may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles.
   (C)   There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user.
(‘77 Code, § 7-115) (Ord. 1585, passed 10-21-85; Am. Ord. 102, passed 1-21-02)