1181.06 APPLICATION PROCEDURES.
   (a)   Soil Disturbing Activities Submitting a Stormwater Pollution Prevention Plan: The owner shall submit two (2) sets of the SWP3 and the applicable fees to the Village as follows:
      (1)   For subdivisions: After the approval of the preliminary plans and with submittal of the improvement plans.
      (2)    For other construction projects: Before issuance of a zoning permit.
      (3)    For general clearing projects: Before issuance of a zoning permit
   (b)    Soil Disturbing Activities Submitting an Abbreviated Stormwater Pollution Prevention Plan: The owner shall submit two (2) sets of the Abbreviated SWP3 and the applicable fees to the Village as follows:
      (1)   For single-family home construction: Before issuance of a zoning permit by the Zoning Inspector.
      (2)    For other construction projects: Before issuance of a zoning permit.
      (3)    For general clearing projects: Before issuance of a clearing permit by the Building Inspector.
   (c)   Soil disturbing activities shall not begin and building permits shall not be issued without an approved SWP3 or Abbreviated SWP3 and installation of perimeter sediment controls.
   (d)   SWP3 for individual sub-lots in a subdivision will not be approved unless the larger common plan of development or sale containing the sub-lot is in compliance with this regulation.
   (e)   For an SWP3 the developer, engineer and contractor, and other principal parties, shall meet with the Village Engineer for a Pre-Construction Meeting no less than seven (7) days prior to soil-disturbing activity at the site to ensure that erosion and sediment control devices are properly installed, limits of disturbance and buffer areas are properly delineated and construction personnel are aware of such devices and areas.
   (f)   Approvals issued in accordance with this regulation shall remain valid for one (1) year from the date of approval.
(Ord. 2016-100. Passed 12-14-16.)