921.02 PHOTOGRAPHS OF PROPOSED SEWERS REQUIRED.
   (a)   The Building Inspector is directed, prior to final approval of any newly installed sewer system or reconstructed sewer, to require any and all contractors to make one set of photographs of the entire sewer system installed, both sanitary and storm, at the completion of all mains, showing thereby that the sewer system has been constructed upon sound engineering standards and that the system is free of any and all accumulations of foreign substance and nature and that the passage and flow of sewage and storm water is free and clear.
   (b)   Upon inspection of these photographs, and if satisfied that the sewer is free and clear of all foreign substance, and is of sound workmanship, and that there is nothing present to prevent the free flow of sewage and storm waters, the Building Inspector is authorized to approve same as a final inspection, placing in safekeeping all photographs for future reference.
   (c)   The cost of this photographing and photographs shall be paid for entirely by the contractor or developer of the land or sewer system, and these photographs shall remain the property of the Municipality.
(1973 Code Sec. 51.02)