The erosion and sediment control plan and application for grading permit shall include but not be limited to the following data as applicable:
(A) A vicinity map sufficient to locate the site and to show the relationship of the site to its general surroundings at a scale of not less than one mile to one inch;
(B) A site plan, drawn to a scale of not less than 200 feet to one inch, and supporting specifications and schedules showing:
(1) The banner lines of the site on which the work is to be performed, including the approximate acreage of the site;
(2) Existing contours with intervals of not more than five feet;
(3) Proposed physical improvement on the site, including present development and future utilization, if known;
(4) All drainage provisions, flood protection provisions, erosion and sediment control measures, vegetative practices or other protective devices to be utilized in connection with, or as a part of, the proposed work;
(5) Provisions for erosion control during construction (temporary) and during the life of the facility (permanent). These provisions shall include a timing schedule and sequence of operations indicating the anticipated starting and completion dates of the particular development sequence, and the estimated time of control measures. Specifications accompanying the plan shall include, as appropriate, seeding mixes and application rates, type of sod, seedbed preparation, lime and fertilizer application, mulching and other related data;
(6) A complete and adequate grading plan for borrow pits and material processing facilities, where applicable, including provisions for adequate drainage in the areas;
(7) A general description of the predominant soil types of the site;
(8) The name and address of the owner, developer and petitioner, and the individual responsible for satisfactory completion of the work described in the plan, if different from the above;
(9) Title, scale, north arrow, data and name of the individual or organization preparing the plan, with seal when applicable; and
(10) The plan and application shall be supported by supplemental reports, specifications, data and additional reports, specifications, data and additional information as the town may reasonably require, including but not limited to finished contours, elevations, dimensions, locations, slopes, storm drainage computations and field investigation reports on soil, drainage and flooding.
(C) Applicant’s certification statement:
“I (We) hereby certify that all clearing, grading, construction and/or development will be done pursuant to this plan.
Date Permit Applicant”
(D) Design certification statement:
“I hereby certify that this plan is designed to contain sediment on the property concerned to the maximum extent feasible. Provisions for erosion and sediment control are in accordance with the Sediment and Erosion Control Ordinance (Chapter 152 of the city code).
Date
Registered Professional Engineer, Professional Soil Conservationist, or Registered Landscape Architect”
(1995 Code, § 5-1085) (Ord. passed 7-1-1986)