Section 15.26.090   Inspection of stormwater sewer connection.
   A written notice of intention to make a connection with a public stormwater sewer shall be filed at the office of the Director of Engineering at least twenty-four (24) hours before such connection is made. Every connection shall be left uncovered until it has been inspected and approved by the Director of Engineering, or an inspector from his or her office.
(MC-5- 2020, § 26, Amended 11/17/2020; MC-5-2014 § 5, 04/17/2014)