A. Spot survey. A spot survey certified by an Illinois registered land surveyor to show the exact location on the lot and full dimensions of a structure's foundation shall be required for all new primary structures upon completion of the structure's foundation. In addition, the Director may require the owner to submit such a survey, upon the completion of a foundation if the Director determines that such survey is necessary for an accurate inspection of the foundation and its size and location. When a spot survey is required by the Director or this section, no further work shall be done, other than installing drain tile and waterproofing the foundation, until the foundation has been inspected and the spot survey has been approved by the Village.
(Prior code § 23.25)
B. Floor elevation survey. A floor elevation survey prepared and certified by an Illinois registered land surveyor to show the exact elevations of all building floor and roof peaks shall be required for all new primary structures upon completion of framing of the structure. When a floor elevation survey is required by the Director or this section, no further work shall be done until the survey has been reviewed and approved by the Village.
(MC-4-2012, § 27, Amended, 07/17/2012)