(A) Fee zones. The following are building permit fees, zoning fees, and inspection fees for districts AG-B, C-1, C-2, C-3, M-1, and PDC.
(B) Building permit fees.
Building Permit Fees for New Commercial, M-1, and AG-B Zoning District Construction and Remodeling, Based on Floor Space | ||
Type of Structure | Type of Use | Fees |
All usual buildings | Any use | $0.80 per sq. ft. |
Special buildings open on two or more sides | Any use | $0.65 per sq. ft. |
(C) Accessory structure permit fees.
Accessory Structure Fees for New Commercial, M-1, and AG-B Zoning District Construction and Remodeling, Based on Floor Space | ||
Type of Structure | Type of Construction | Fees |
Accessory Structure Fees for New Commercial, M-1, and AG-B Zoning District Construction and Remodeling, Based on Floor Space | ||
Type of Structure | Type of Construction | Fees |
Communication towers and antennas | Satellite dishes, over 18 inches in diameter | $60 each |
Communication towers and antennas | Standalone towers and antennas | $6 per ft. in height |
Communication towers and antennas | Roof- or wall-mounted towers and antennas | $35 each |
Communication towers and antennas | Engineering fees if required | Paid by permit holder |
Decks, porches, patios | $0.40 per sq. ft. | |
Lighting standards, or poles | $30 each | |
Swimming pools–up to 800 sq. ft. | $50 per sq. ft. | |
Swimming pools–each additional over 801 sq. ft. | $0.25 per sq. ft. | |
(D) Certificate of occupancy fees.
Certificate of Occupancy Fees for New Commercial, M-1, and AG-B Construction and Remodeling | |
Type of Structure | Fees |
Buildings | $100 each |
Other structures | $60 each |
(E) Zoning fees.
Zoning Fees for New Commercial, M-1, and AG-B | ||
Type of Structure or Action | Type of Construction | Fees |
Change of permitted use | $75 each | |
Primary structure | New construction | $200 each |
Other buildings and additions | $100 each | |
Signs | $60 each |
(F) Other construction permit fees.
Other Commercial, M-1, and AG-B Zoning District Construction Permit Fees | ||
Type of Permit | Comments | Fees |
Other Commercial, M-1, and AG-B Zoning District Construction Permit Fees | ||
Type of Permit | Comments | Fees |
Fence permit | Includes zoning fee | $60 each |
Foundation-only permit | Details in division (K) of this section | $300 administrative, plus $.50 per sq. ft. of area covered by the foundation |
Replacement permit cards | $30 each | |
Maintenance/repair, re-roofing, downspout, fascia/gutter | Plus inspection(s), as needed | $50 base fee |
Maintenance/repair, replace siding/exterior change | Plus inspection(s), as needed | $50 base fee |
Maintenance/repair, HVAC/ plumbing/hot water tank | Plus inspection(s), as needed | $50 base fee |
Maintenance/repair, window replacement | Plus inspection(s), as needed | $50 base fee |
Sign permit | Permanent, any type | $125 each, plus engineering fee |
Sign permit | Portable and mobile, registration fee | $40 each use |
Sign permit | Engineering fees if required | Paid by permit holder |
Utility service change or upgrade–permit and inspection | Gas, electric, sewer, septic, private well, or community water system | $100 each service change plus inspection fees |
Site development | $150 | |
(G) Inspection fees.
Inspection Fees, Commercial, M-1, and AG-B Zoning District | |||
Type of Inspection | Item | Item Details | Fees |
Inspection Fees, Commercial, M-1, and AG-B Zoning District | |||
Type of Inspection | Item | Item Details | Fees |
Acoustic ceiling | 5,000 sq. ft. area or less | $85 each structure | |
Acoustic ceiling | Each additional 1,000 sq. ft. | $35 each additional | |
Amended permit fee | At anytime a permit needs to be amended, plus costs (i.e., inspections, square footage, and the like) | $100 | |
Concrete floors or walls, pre-pour | Base and vapor barrier, when used | 5,000 sq. ft. area or less | $85 each structure |
Concrete floors or walls, pre-pour | Base and vapor barrier, when used | Each additional 1,000 sq. ft. or fraction thereof | $35 each additional |
Concrete floors or walls, pre-pour | Concealed utilities | 5,000 sq. ft. area or less | $85 each structure |
Concrete floors or walls, pre-pour | Concealed utilities | Each additional 1,000 sq. ft. or fraction thereof | $35 each additional |
Electrical service, new or change | 100 amp or less | $165 each service | |
Electrical service, new or change | Each additional 100 amp | $75 | |
Electrical service, new or change | Addition of new branch circuits with service change or remodeling only | 100 amp or less | $125 each service |
Electrical service, new or change | Addition of new branch circuits with service change or remodeling only | Each additional 100 amp | $75 |
Erosion control | Property check | $85 | |
Final | Use categories as for rough-in below | See rough-in fees below | |
Footings | 5,000 sq. ft. in area or less | $85 each structure | |
Footings | Each additional 1,000 sq. ft. or fraction thereof | $35 | |
Footings–pre-pour | 5,000 sq. ft. in area or less | $85 each structure | |
Footings–pre-pour | Each additional 1,000 sq. ft. or fraction thereof | $35 | |
Foundation | 5,000 sq. ft. in area or less | $85 each structure | |
Foundation | Each additional 1,000 sq. ft. or fraction thereof | $35 | |
Footings–pre-pour | Each additional 1,000 sq. ft. or fraction thereof | $35 | |
Ice-shield inspection | $85 each | ||
Insulation | 5,000 sq. ft. in area or less | $85 each structure | |
Insulation | Each additional 1,000 sq. ft. | $35 each additional | |
Masonry | $85 each structure | ||
Parking lots | Subgrade | One hour minimum | $85 per hour |
Parking lots | Pre-pavement | One hour minimum | $85 per hour |
Re-inspections | Any of: footings, foundation, concrete floors or walls (pre-pour), electrical service (new or change), rough-in, or final | $80 per trade | |
Retention or detention ponds, tanks, reservoirs | Up to one acre-ft. capacity | $175 | |
Retention or detention ponds, tanks, reservoirs | Each additional acre-ft. capacity | $65 | |
Rough-in | Total fee | Total of plumbing, HVAC, electrical, and framing fees below | $85 minimum per trade |
Rough-in | Plumbing | 10 fixtures total or less | $85 each structure |
Rough-in | Plumbing | Each additional fixture | $20 |
Rough-in | Plumbing–sprinkler | Each head | $10 |
Rough-in | HVAC | 5,000 sq. ft. or less of conditioned space | $85 each structure |
Rough-in | HVAC | Each additional 1,000 sq. ft. or fraction thereof | $35 |
Rough-in | Electrical | 5,000 sq. ft. floor space or less | $85 each structure |
Rough-in | Electrical | Each additional 1,000 sq. ft. or fraction thereof | $35 |
Rough-in | Framing | 5,000 sq. ft. floor space or less | $85 each structure |
Rough-in | Framing | Each additional 1,000 sq. ft. or fraction thereof | $35 |
Sanitary and storm sewers, water lines | Manholes and pipes | One hour minimum | $85 per hour |
Sanitary and storm sewers, water lines | Taps | $75 each | |
Streets and roads | Subgrade | Each 1,000 linear ft. | $85 |
Streets and roads | Pre-pavement | Each 1,000 linear ft. | $85 |
Streets and roads | Road shoulder finished grade | Each 1,000 linear ft. | $60 each ln. ft. |
Temporary occupany fee | To convert to final occupancy | $200 | |
Others as required | Fire Code, when required | As set by Fire Prevention Bureau | As given in § 150.25 |
Others as required | Miscellaneous (not listed above), when required | As determined by Town Engineer and/or Building Administrator | |
Violations inspection | $200 each violation | ||
(H) Relocated structure or building permit; commercial, M-1, and AG-B. The same fees apply as are applied above to new construction.
(I) Demolition fees.
Demolition Fees; Commercial, M-1, and AG-B | |
Type of Structure | Fees |
All primary use buildings | $100 |
All accessory buildings | $55 each structure |
Engineering fees if required | Paid by permit holder |
Required inspections | Use schedule above |
(J) Minimum fees, commercial, M-1, and AG-B. No permit fee for a construction or remodeling project shall be less than $100. The zoning fee, if required, the cost of any required inspection fees as listed above, and the cost of a certificate of occupancy, if required, are additional costs. The minimum permit fee does not apply to a fence-only permit or demolition permits.
(K) Foundation-only permit; optional.
(1) A permit for a structure foundation may be issued prior to the application for and approval of permits required under divisions (B) and (C) above. The Town Building Administrator and the Town Engineer shall set guidelines for information required to be submitted.
(2) The applicant will complete a waiver approved by the Plan Commission Attorney as part of the requirements for the permit.
(3) The scope of this permit is limited to footings, foundation walls of which at least 75% will be below grade, and concrete floors at or below grade. Plumbing, electrical, and HVAC work is limited to those specific items needed prior to backfilling and/or pouring concrete floors.
(4) This permit expires in 30 days from issuance unless a complete application for a building permit as required in division (B) or (C) above is filed with the Building Administrator prior to expiration.
(5) The fees shall be as given above in division (F) of this section. All necessary inspection fees will be charged per division (G) above. A credit will be issued for the portion of the valid foundation-only permit fee based on square footage to be used only for the subsequent building permit. The credit is limited to the amount of the building permit fee based on square footage under division (B) or (C) above, whichever is applicable, for the same structure as the foundation-only permit. No credit will be issued for an expired foundation-only permit.
(6) If this permit expires, no fees will be credited or refunded, and the applicant must re-apply for a foundation-only permit or make application for a full permit under division (B) or (C) above.
(L) Street, alley, sidewalk, public way opening permit fees.
Type of Permit | Comments | Fees |
Street opening | Any cut or opening made. | $250 |
Alley opening | Any cut or opening made. | $250 |
Sidewalk opening | Any cut or opening made. | $250 |
Rights-of-way turf opening | Any cut or opening made. | $125 |
Type of Inspection | Comments | Fees |
Street and alley | Any cut or opening made. | Direct cost reimbursement |
Sidewalk | Any cut or opening made. | Direct cost reimbursement |
Public way | Any cut or opening made, including turfed areas. | Direct cost reimbursement |
(1) Each permit for making an opening shall be confined to a single project, and shall be issued by the executive or other duly designated town representative. Application shall be made on a form proscribed by the Town Council providing the exact location of the proposed opening, the kind or type of paving, turf or fill, the area and depth to be excavated, and such other facts and information as may be required. The town and/or the Town Engineer reserve the right to impose reasonable conditions upon the applicant, as well as the right to deny the application in order to protect town improvements or upon a finding that a less intrusive method exists.
(2) No permit shall be issued until or unless the applicant tenders and pays the fee required in conformance with the schedule contained hereinafter. The permit fee is in an amount reasonably calculated to cover at least a portion of the cost of restoration and maintenance of the opening, as well as all other related administrative expenses thereto.
(3) All such fees collected for the purposes stated herein shall be deposited in the town’s General Fund for use consistent with the requirements of this chapter, as amended hereafter from time to time.
(4) The opening, restoration and maintenance of a pavement or other surface shall be performed under the direction and to the satisfaction of the Town Engineer, or other duly designated town representative, and in accordance with rules, regulations, and specifications approved by the Town Council.
(5) In the event of the failure and/or refusal of the permittee to satisfactorily fill the excavation, restore the surface and remove all excess materials in accordance with the terms of the permit, and within the time specified in the permit, or where such time period is not specified in the permit within a reasonable time, the town may proceed to make such fill and restoration. In the event the amount of the costs incurred by the town exceed the amount of the restoration services performed by it, the town shall be entitled and permitted to collect any excess amount due and owing from the permittee, including attorney’s fees, court costs, and similar related expenses of collection.
(Ord. 41, passed 2-18-1998; Am. Ord. 41A, passed 3-17-1999; Am. Ord. 41B, passed 3-18-2004; Am. Ord. 41C, passed 4-23-2004; Am. Ord. 41D, passed 2-21-2006; Am. Ord. 41F, passed 12-16-2008; Am. Ord. 41H, passed 10-20-2009; Am. Ord. 210, passed 9-11-2012; Am. Ord. 41-J, passed 9-24-2013; Am. Ord. 41-K, passed 10-8-2019; Am. Ord. 41-L, passed 3-8-2022)