3-10-7: FLOORS; CONSTRUCTION:
The floor of every laundry and every room or place in connection therewith shall be constructed of concrete, cement, tile or stone laid in cement, or other impervious material and shall be watertight and properly drained to the public sewer. The angles where the floor and wall join shall likewise be watertight. (Ord. 61-O-43, 6-26-1961)