1127.07 OTHER UTILITIES.
   The developer shall submit plans for electric, cable TV and telephone service lines and gas mains for approval by the Planning and Zoning Commission and arrange to have the underground utilities installed before any public or private roadway is constructed. The gas meters and manifolds shall be located in the side or front yard but not more than five feet in front of the setback line. Utility easements of twelve (12) feet in width for communication, electrical; service, gas and street lighting distribution lines and facilities shall be provided on all front lot lines and along certain side or rear lot lines where necessary. Easements may also be required along or across lots where necessary to accommodate special conditions as warranted by the design and/or the City Engineer. (Ord. 2006-35. Passed 5-25-06.)