1335.09   FEE SCHEDULE.
   (a)   No permit required by this chapter shall be issued until the fee prescribed in this section has been paid, nor shall an amendment to a permit be approved until the additional fee, if any, due to an increase in the estimated cost of the building or structure, has been paid.
   (b)   For a permit for the construction or alteration of a building or structure, the following schedule of fees shall prevail:
Residential (includes attached garages)
$60.00
Garage or outside building
20.00
Industrial
30.00
Business-commercial
30.00
Alterations and additions:
   Residential additions
30.00
   Residential alterations
20.00
   Industrial
20.00
   Business-commercial
10.00
Heating system, including wiring
25.00
Plumbing - residential
40.00
Electric - residential
45.00
Application for permit after work has begun
Permit fees are doubled
Re-inspection fee (after first re-inspection)
25.00
 
No fee or permit shall be required for alterations costing less than seven hundred fifty dollars ($750.00) . A person doing his or her own work must add fifty percent to the cost of materials for labor to determine the total cost of alterations.
   (c)   For a permit for the moving of a building or structure from one lot to another, or within the same lot, the fee shall, be thirty dollars ($30.00). For unattached garages or out buildings, the fee shall be twenty dollars ($20.00). For a permit for the demolition of a building or structure, the fee shall be the cost of materials for labor to determine the total cost of alterations.
(Ord. 2832. Passed 7-16-84; Ord. 4956. Passed 3-4-02; Ord. 5560. Passed 5-19-14.)