Fees for the Division of Water, including water and sewer rates and tap fees shall be as follows:
(a) Water Rates (within Village limits)
(1) Minimum charge for one month or up to 2,000 gallons | $17.32 |
(2) Per 1,000 gallons thereafter | $8.66 |
(b) Water Rates (outside Village limits)
(1) Minimum charge for one month or up to 2,000 gallons | $36.34 |
(2) Per 1,000 gallons thereafter | $18.17 |
(c) Monthly Capital Improvement charge per meter by meter size:
Meter Size | Charge |
5/8" - 3/4" | $2.50 |
1" | $6.25 |
1-1/2" | $12.50 |
4" | $50.00 |
6" | $82.50 |
(d) Sewer Rates (within Village limits)
(1) Minimum charge for one month or up to 2,000 gallons | $10.92 |
(2) Per 1,000 gallons thereafter | $5.46 |
(3) Minimum charge for one month for those residents not connected to the Village water system | $40.91 |
(e) Sewer Rates (outside Village limits)
(1) Minimum charge for one month up to 2000 gallons for Non-residents with water service (110% surcharge for outside Village) | $22.92 |
(2) Per 1,000 gallons thereafter (110% surcharge for outside Village) | $11.46 |
(3) Minimum charge for one month for non-residents not connected to the Village water system | $85.86 |
(f) Monthly Capital Improvement charge per meter by meter size:
Meter Size | Charge |
5/8" - 3/4" | $4.01 |
1" | $8.53 |
1-1/2" | $16.03 |
4" | $61.20 |
6" | $100.33 |
(g) Additional miscellaneous charges:
(1) Water shut-off due to non-payment of a bill (first time) | $20.00 |
(2) Employee over-time to cover cost of turning water back on if payment is made after 4:00 p.m | $75.00 |
(3) Deposit for all rental properties before service is turned on | $100.00 |
(4) Replace frozen water meter | Cost of meter plus labor |
(5) 10% late payment on bills paid after due date | |
(6) Collection fee charged to all delinquent bills if no prior arrangements have been made for payment | $10.00 |
(7) Fee for tampering with meter | $250.00 |
(8) Bulk water, plus cost per gallon | $25.00 |
(9) Damaged service line | Cost of parts plus labor |
(10) Unauthorized use of hydrant, theft of water | $250.00 |
(11) Bulk water hydrant meter set up (rental fee), plus cost per gallon | $100.00 |
(h) Water and sewer tap fees for new construction
(1) Sewer tap fee for Village residents | $1,100.00 |
(2) Sewer tap fee for non-Village residents | $2,310.00 |
(3) Water tap fee for Village residents | $750.00 |
(4) Water tap fee for non-Village residents | $1,500.00 |
(5) Fireline or fire suppression line | Cost of materials plus inspection |
(Ord. 18-2023. Passed 11-21-23.)