§ 127.53 WATER SUPPLY DETAILS.
Detail No.
Description
Detail No.
Description
Water Main Separation
Plug Valve and Box Detail
Gate Valve and Valve Box Detail
Valve Box Concrete Collar Detail
Water Details
Typical for 5/8", 1", 1-1/2" or 2" Meter
Meter Box Detail U.S. Foundry No. 7630
Meter Installation for 1-1/2"or 2" Meter
Water Meter Locations
Looped Water Main System
Fire Hydrant Detail
Guard Post Detail
Fire Hydrant- Fire Dept. Connection Location
Standard Fire Dept. Connection Detail
Standard Fire Hydrant Placement Detail
Typ. Fire Hydrant/Fire Dept. Connection Island Detail
Sampling Point Detail
Crossing General Requirements
Typical Connection to Existing Main
Type 1 Private Fire Protection 4", 6" @ 8" Diameter Connection
Type 2 Private Fire Protection 4", 6" @ 8" Diameter Connection
Type 3 Private Fire Protection 2" Diameter Connection
Backflow Preventer
Manual Blow Off
PVC Pipe Locating Wire and Identification Tape Detail
 
[Note: To view these images in PDF, click HERE]
(Ord. 2010-20, passed 10-4-2010)
 
W-1 - Water Main Separation
Date: February, 2010
 
 
W-2 - Plug Valve and Box Detail
Date: February, 2010
 
 
W-3 - Gate Valve and Valve Box Detail
Date: February, 2010
 
 
W-4 - Valve Box Concrete Collar Detail
Date: February, 2010
 
 
W-5 - Water Service Connection Details
Date: February, 2010
 
 
W-6 - Typical Service Connection for 5/8", 1", 1-1/2"or 2" Meter
Date: February, 2010
 
 
W-7 - Meter Box Detail U.S. Foundry No. 7630
Date: February, 2010
 
 
W-8 - Meter Installation for 1-1/2" or 2" Meter
Date: February, 2010
 
 
W-9 - Water Meter Locations
Date: February, 2010
 
 
W-10 - Looped Water Main System
Date: February, 2010
 
 
W-11 - Fire Hydrant Detail
Date: February, 2010
 
 
W-12 - Guard Post Detail
Date: February, 2010
 
 
W-13 - Fire Hydrant- Fire Dept. Connection Location
Date: February, 2010
 
 
W-14 - Standard Fire Dept. Connection Detail
Date: February, 2010
 
 
W-15 - Standard Fire Hydrant Placement Detail
Date: February, 2010
 
 
W-16 - Typ. Fire Hydrant/Fire Dept. Connection Island Detail
Date: February, 2010
 
 
W-17 - Sampling Point Detail
Date: February, 2010
 
 
W-18 - Utility Crossing General Requirements
Date: February, 2010
 
 
W-19 - Typical Connection to Existing Main
Date: February, 2010
 
 
W-20 - Type 1 Private Fire Protection 4", 6" @ 8" Diameter Connection
Date: February, 2010
 
 
W-21 - Type 2 Private Fire Protection 4", 6" @ 8" Diameter Connection
Date: February, 2010
 
 
W-22 - Type 3 Private Fire Protection 2" Diameter Connection
Date: February, 2010
 
 
W-23 - Backflow Preventer
Date: February, 2010
 
 
W-24 - Manual Blow Off
Date: February, 2010
 
 
W-25 - PVC Pipe Locating Wire and Identification Tape Detail
Date: February, 2010