1177.20 DRAINAGE IMPROVEMENTS.
   (a)   The subdivider shall construct all necessary facilities including underground pipe, inlets, catch basins, open drainage ditches, and detention basins as approved by the Village Engineer, to provide for adequate disposal of subsurface and surface water and maintenance of natural drainage course. The developer shall also provide all necessary soil sediment pollution control. Design and construction shall be in accordance with the Design Criteria, Construction Standards and Drawings, and Storm Water Management Plan of the Village. Adequate provisions shall be included in design and construction to accommodate all upstream drainage and, where necessary, extend all drainage improvements to plat limits.
   (b)   It shall state on the final plat that all natural watercourses, detention basins, retention ponds, and appurtenances shall be maintained by the property owner. An easement shall be provided to ensure that there will not be any building within the drainage area and to provide for major maintenance and inspection. See the Design Criteria for inspection and ownership of detention basin requirements for placement of statements on deeds.
(Ord. 2021-17. Passed 9-8-21.)